GASolver-A Solution to Resource Constrained Project Scheduling by Genetic Algorithm

The Resource Constrained Scheduling Problem (RCSP) represents an important research area. Not only exact solution but also many heuristic methods have been proposed to solve RCPSP (Resource Constrained Project Scheduling Problem). It is an NP hard problem. Heuristic methods are designed to solve large and highly Resource Constrained software projects. We have solved the problem of resource constrained scheduling problem and named as GASolver. It is implemented in C# using .net platform. We have used Dependency Injection to make the problem loosely coupled, so that other arena of scheduling like Time Cost Tradeoff (CT), Payment Scheduling (PS) etc can be merged with same solution in the future. We have implemented GASolver using Genetic Algorithm (GA).

Paper

Full text

PDF

GASolver-A Solution to Resource Constrained Project Scheduling by Genetic Algorithm

Semantic Scholar · Computer Science · 2013

Abstract

The Resource Constrained Scheduling Problem (RCSP) represents an important research area. Not only exact solution but also many heuristic methods have been proposed to solve RCPSP (Resource Constrained Project Scheduling Problem). It is an NP hard problem. Heuristic methods are designed to solve large and highly Resource Constrained software projects. We have solved the problem of resource constrained scheduling problem and named as GASolver. It is implemented in C# using .net platform. We have used Dependency Injection to make the problem loosely coupled, so that other arena of scheduling like Time Cost Tradeoff (CT), Payment Scheduling (PS) etc can be merged with same solution in the future. We have implemented GASolver using Genetic Algorithm (GA).

References (13)

05IJACSA) International Journal of Advanced Computer Science and Applications2013 · IJACSA) International Journal of Advanced Computer Science and Applications
06Finding a Hybrid Genetic Algorithm-ConstraintSatisfaction Problem basedSolution for ResourceConstrained Software project Scheduling University of Technology, Industrial faculty, IT group2009
07Guang-Qiandu2, A GA- Based Approach for solving fuzzy siftware project scheduling2007 · Proceedings of the Sixth International Conference on Machine Learning and Cybernetics,
083Resource- Constrained Software project Scheduling Problem2006 · Proceedings of the 6th World Congress on Intelligent Control and Automation, June
09A Robust Genetic Algorithm for resource allocation in software project scheduling2001 · Annals of operations Research
11Evaluating Software project Scheduling and Due Date Assignment Procedures: An Experimental Analysis1988 · Management Science
12Multiple Resourceconstrained Scheduling Using Branch-and-Bound1978 · AIIE Transactions

Scroll for more · 1 remaining