Patent №
US 10,697,432
Granted
2020-06-30
Filed 2018
Owner
GENERAL ELECTRIC COMPANY
Lab
—
AI components
1
planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
16054393
A method for operating at least one energy storage device of a renewable energy facility connected to a power grid in multiple operational modes includes providing an operational threshold for the renewable energy facility. Further, the method includes comparing an operational parameter of the renewable energy facility with respect to the operational threshold. The method also includes controlling the renewable energy facility based on the comparison. As such, when the operational parameter is below the operational threshold, the controller communicates to the energy storage device(s) to increase its state of charge (SOC) in anticipation of the renewable energy facility transitioning from producing power to consuming power. In contrast, when the operational parameter is at or above the operational threshold, the controller communicates to the energy storage device(s) to decrease its state of charge (SOC) in anticipation of a curtailment event of the power grid to prevent the renewable energy facility from releasing and sending power to the power grid.
AI classification
Ownership
GENERAL ELECTRIC COMPANY
assignment · 465510617
Assignors
VENKITANARAYANAN, VAIDHYA NATH, ARSUAGA SANTOS, PEDRO, DEWITT, MEGAN ANN
On an employer assignment, the assignors are typically the inventors.