Wind Farm Energy Storage Device for Curtailment and Auxiliary Loads Use

Patent №

US 10,697,432

Granted

2020-06-30

Filed 2018

Owner

GENERAL ELECTRIC COMPANY

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

16054393

A method for operating at least one energy storage device of a renewable energy facility connected to a power grid in multiple operational modes includes providing an operational threshold for the renewable energy facility. Further, the method includes comparing an operational parameter of the renewable energy facility with respect to the operational threshold. The method also includes controlling the renewable energy facility based on the comparison. As such, when the operational parameter is below the operational threshold, the controller communicates to the energy storage device(s) to increase its state of charge (SOC) in anticipation of the renewable energy facility transitioning from producing power to consuming power. In contrast, when the operational parameter is at or above the operational threshold, the controller communicates to the energy storage device(s) to decrease its state of charge (SOC) in anticipation of a curtailment event of the power grid to prevent the renewable energy facility from releasing and sending power to the power grid.

PlanningH02J 3/28F03D 7/048H02J 3/14H02J 3/381H02J 7/345F03D 9/11F03D 9/255F05B 2260/42+11 more

AI classification

Planning0.96
Knowledge representation0.02
Vision0.01
AI hardware0.00
Machine learning0.00
Evolutionary computation0.00
Natural language0.00
Speech0.00

Ownership

GENERAL ELECTRIC COMPANY

assignment · 465510617

Assignors

VENKITANARAYANAN, VAIDHYA NATH, ARSUAGA SANTOS, PEDRO, DEWITT, MEGAN ANN

On an employer assignment, the assignors are typically the inventors.

From the same owner

© 2026 NYSGPT2525 LLC