Patent №
US 10,922,452
Granted
2021-02-16
Filed 2018
Owner
CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED
+1 more
Lab
—
AI components
2
planning · hardware
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
15757401
A digital simulation system of a power distribution network, comprising: a client and a server end. The server end is a simulation server cluster composed of several simulation servers; the simulation server cluster and the client are mutually connected through a communication bus, wherein the client is configured to use a DCOM component to invoke a simulation service provided by the server end, and the server end is configured to distribute a task to be processed to each cluster node. Constructing the above-mentioned digital simulation system facilitates an optimal planning and operation of a smart power distribution network, thereby improving the utilization efficiency and reliability of the smart power distribution network and reducing the loss of a power outage.
AI classification
Ownership
CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED
assignment · 463530335
STATE GRID CORPORATION OF CHINA
assignment · 463530335
Assignors
LIU, KEYAN, SHENG, WANXING, DIAO, YINGLONG, TANG, JIANGANG, YE, XUESHUN, HE, KAIYUAN, JIA, DONGLI, HU, LIJUAN
On an employer assignment, the assignors are typically the inventors.