METHOD FOR REAL-TIME STRENGTH ESTIMATION, GRADING, AND EARLY WARNING OF ROCK MASS IN TUNNEL BORING MACHINE (TBM) TUNNELING

Patent №

US 11,808,152

Granted

2023-11-07

Filed 2023

Owner

SHIJIAZHUANG TIEDAO UNIVERSITY

+1 more

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

18104831

A method for real-time strength estimation, grading, and early warning of rock mass in tunnel boring machine (TBM) tunneling, and belongs to the technical field of TBM tunnel construction. The method includes the following steps: establishing a general relation model of equivalent strength Rec of the TBM boring rock mass and a field penetration index (FPI); and applying the model to TBM boring construction, estimating an integrity coefficient Kv of the TBM boring rock mass in real time according to boring parameters acquired by a TBM in real time, and performing grading and early warning on the TBM boring rock mass according to a given grading standard and early warning values.

PlanningE21F 17/18E21D 9/003E21D 9/087E21F 17/185G01V 20/00G06F 30/13G06F 30/20G06Q 10/06393+1 more

AI classification

Planning0.94
Natural language0.00
AI hardware0.00
Vision0.00
Knowledge representation0.00
Machine learning0.00
Speech0.00
Evolutionary computation0.00

Ownership

SHIJIAZHUANG TIEDAO UNIVERSITY

assignment · 625700991

CHINA STATE RAILWAY GROUP CO., LTD.

assignment · 625700991

Assignors

DU, LIJIE, LI, QINGWEI, YANG, YALEI, ZHAO, YONG, TIAN, SIMING

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC