TURBINE GUIDE AND A METHOD FOR REGULATING A LOAD CYCLE PROESS OF A TURBINE

Patent №

US 6,239,504

Granted

2001-05-29

Filed 1999

Owner

SEIMENS AKTIENGESELLSCHAFT

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

09307997

A turbine guide regulates a load cycle process in a turbine. The turbine guide has a limiting unit, to which a variable for a variable pre-setting of a time duration t.sub.v of the load cycle process can be fed. In the limiting unit, a determination of a turbine guide variable takes place for carrying out the load cycle process in the time duration t.sub.v under consideration of a maximum permissible limiting value. In an exhaustion unit an advance determination of the material exhaustion of the load cycle process to be carried out according to the turbine guide variable takes place. The invention further pertains to a method for regulating a load cycle process of a turbine.

PlanningF01D 19/02F01D 21/12

AI classification

Planning1.00
Knowledge representation0.28
Speech0.01
Natural language0.01
AI hardware0.00
Vision0.00
Evolutionary computation0.00
Machine learning0.00

Ownership

SEIMENS AKTIENGESELLSCHAFT

assignment · 117200108

Assignors

GOBRECHT, EDWIN, LANGBEIN, ROLF

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC