FLEXIBLE MANUFACTURING SYSTEM

Patent №

US 6,574,520

Granted

2003-06-03

Filed 2000

Owner

PROCTER & GAMBLE COMPANY, THE

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

09496480

A flexible manufacturing system including at least one module, a operational unit mounted to said at least one module and a local controller operatively connected to the operational unit. The local controller is adapted to control the operational unit. The at least one module and the local controller together are capable of operating in a standalone operation or of integration into a flexible manufacturing system. The local controller is further adapted to receive a reference signal from the flexible manufacturing system and to synchronize the operational unit to the flexible manufacturing system when the at least one module is connected to the flexible manufacturing line.

PlanningB32B 39/00A61F 13/15804Y10T 29/5124Y10T 29/5136

AI classification

Planning0.91
Knowledge representation0.00
Natural language0.00
Machine learning0.00
Vision0.00
Speech0.00
AI hardware0.00
Evolutionary computation0.00

Ownership

PROCTER & GAMBLE COMPANY, THE

assignment · 107750428

Assignors

LIU, VINCENT B., WIRES, DONALD L., LAMPING, MICHAEL J., FISHCHER, ALBERT M., MILLER, GARY L.

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC