WIRELESS DOWNWHOLE MEASUREMENT AND CONTROL FOR OPTIMIZING GAS LIFT WELL AND FIELD PERFORMANCE
Patent №
US 6,840,317
Granted
2005-01-11
Filed 2002
Owner
SHELL OIL COMPANY
Lab
—
AI components
1
planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
10220455
A method for optimizing the production of a petroleum well is provided. The petroleum well includes a borehole, a piping structure positioned within the borehole, and a tubing string positioned within the borehole for conveying a production fluid. Production of the well is optimized by determining a flow rate of the production fluid within the tubing string and determining a lift-gas injection rate for the gas being injected into the tubing string. The flow rate and injection rate data is communicated along the piping structure of the well to a selected location, where the data is collected and analyzed. After analysis of the data, an optimum operating point for the well can be determined.
AI classification
Ownership
SHELL OIL COMPANY
assignment · 132550561
Assignors
HIRSCH, JOHN MICHELE, STEGEMEIER, GEORGE LEO, HALL, JAMES WILLIAM, BURNETT, ROBERT REX, SAVAGE, WILLIAM MOUNTJOY, CARL, JR., FREDERICK GORDON
On an employer assignment, the assignors are typically the inventors.