SYSTEM AND METHOD FOR REAL TIME RESERVOIR MANAGEMENT

Patent №

US 7,079,952

Granted

2006-07-18

Filed 2004

Owner

HALLIBURTON ENERGY SERVICES, INC.

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

10929584

A method of real time field wide reservoir management comprising the steps of processing collected field wide reservoir data in accordance with one or more predetermined algorithms to obtain a resultant desired field wide production/injection forecast, generating a signal to one or more individual well control devices instructing the device to increase or decrease flow through the well control device, transmitting the signal to the individual well control device, opening or closing the well control device in response to the signal to increase or decrease the production for one or more selected wells on a real time basis. The system for field wide reservoir management comprising a CPU for processing collected field wide reservoir data, generating a resultant desired field wide production/injection forecast and calculating a target production rate for one or more wells and one or more down hole production/injection control devices.

PlanningE21B 43/14E21B 43/20

AI classification

Planning1.00
AI hardware0.01
Natural language0.00
Machine learning0.00
Evolutionary computation0.00
Vision0.00
Speech0.00
Knowledge representation0.00

Ownership

HALLIBURTON ENERGY SERVICES, INC.

assignment · 174260904

Assignors

THOMAS, JACOB, GODFREY, CRAIG WILLIAM, VIDRINE, WILLIAM LAUNEY, WAUTERS, JERRY WAYNE, SEILER, DOUGLAS DONALD

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC