ARRANGEMENT FOR SCHEDULING TASKS BASED ON PROBABILITY OF AVAILABILITY OF RESOURCES AT A FUTURE POINT IN TIME

Patent №

US 7,386,850

Granted

2008-06-10

Filed 2001

Owner

AVAYA INC.

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

09872188

A resource task-completion forecaster (122) of an ACD (104) determines a probability that an agent (156) will complete servicing a presently-assigned call by a specified time horizon h. The forecaster determines (202) the type of call that the agent is servicing, determines (204) the amount of time t that the agent has already been servicing the call, retrieves (206) the mean and the variance of time historically spent by agents on servicing this type of call to completion, fits (208) the mean and the variance to a lifetime closed-form cumulative-probability distribution F, such as a Weibull distribution, to determine parameters of dispersion and central tendency, evaluates (210, 212) the distribution for t and h+t, computes (216) the probability of the agent not having completed servicing the call by now as Q=1−F(t), and computes (218) the probability that the agent will have completed servicing the call by the time horizon asA resource scheduler (124) sums (302) the probabilities P for all agents to obtain the number of agents that are expected to be available at the time horizon, and schedules (304) for the time horizon no more than that number of new calls for servicing by the agents.

PlanningH04Q 3/64H04Q 2213/1302H04Q 2213/1304H04Q 2213/13072H04Q 2213/13103H04Q 2213/13106H04Q 2213/13335

AI classification

Planning1.00
Knowledge representation0.13
Machine learning0.06
Natural language0.01
AI hardware0.00
Evolutionary computation0.00
Speech0.00
Vision0.00

Ownership

AVAYA INC.

assignment · 118730810

Assignors

MULLEN, DAVID C.

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC