SYSTEM AND METHOD(S) OF BLENDED MINE PLANNING, DESIGN AND PROCESSING

Patent №

US 7,925,474

Granted

2011-04-12

Filed 2006

Owner

BHP BILLITON INNOVATION PTY LTD

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

10530846

The present invention relates to the field of extracting resource(s) from a particular location. In particular, the present invention relates to the planning, design and processing related to a mine location in a manner based on enhancing the extraction of material considered of value, relative to the effort and/or time in extracting that material. The present application discloses, amongst other things, a method of and apparatus for determining the removal of material(s) from a location, determining the removal of material(s) of a differing relative value from a location, determining a schedule corresponding to a risk and/or return basis, determining aggregated block ordering for the extraction of material from a location, determining a schedule for extraction of dumps and determining a mine design.

PlanningE21C 41/26G06Q 99/00

AI classification

Planning1.00
Knowledge representation0.37
AI hardware0.04
Evolutionary computation0.01
Natural language0.01
Machine learning0.01
Vision0.00
Speech0.00

Ownership

BHP BILLITON INNOVATION PTY LTD

assignment · 174190113

Assignors

FROYLAND, GARY ALLAN, MENABDE, MERAB

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC