RESOURCE ALLOCATION AND OUTAGE CONTROL FOR RENEWABLE ENERGY WLAN INFRASTRUCTURE MESH NODE
Patent №
US 7,944,869
Granted
2011-05-17
Filed 2007
Owner
MCMASTER UNIVERSITY
Lab
—
AI components
1
planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
11954819
A mesh node of an infrastructure wireless local area network ‘WLAN’ is coupled to a battery which is coupled to a device that is able to harness energy from a source of renewable energy. Energy management of the mesh node includes conducting simulations of a system comprising the mesh node, the device, and the battery in its current state of charge, determining an admissible load for the mesh node from the simulations, and withholding communication services by the mesh node for one or more periods of time a cumulative duration of which is related to power consumption of the mesh node when handling the admissible load. The simulations involve meteorological data related to the source of renewable energy in the vicinity of the mesh node.
AI classification
Ownership
MCMASTER UNIVERSITY
assignment · 210910428
Assignors
TODD, TERENCE DOUGLAS, FARBOD, AMIN, SAYEGH, AMIR ANTOUN RENNE
On an employer assignment, the assignors are typically the inventors.