METHOD OF ADJUSTING TIMING DIFFERENCE BETWEEN PRE-CORRECTED SOURCE PROGRAM AND POST-CORRECTED SOURCE PROGRAM, COMPILER AND INFORMATION PROCESSOR
Patent №
US 8,312,432
Granted
2012-11-13
Filed 2008
Owner
NEC ELECTRONICS CORPORATION
Lab
—
AI components
2
nlp · hardware
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
12232005
A method of adjusting a control timing accompanying a program correction of a machine language program executed by an information processor includes preparing a first machine language program obtained by compiling a first source program and generating a second intermediate language program from a second source program, the second source program being corrected from the first source program. Then, the method computes a first number of clock cycles, that is a number of clock cycles to execute a first machine language program obtained by compiling the first source program and computes a second number of clock cycles, that is a number of clock cycles to execute a second machine language program obtained by compiling the second source program, using the second intermediate language program, the second intermediate language program including an instruction that is uniquely correlated with a machine language instruction of the second machine language program.
AI classification
Ownership
NEC ELECTRONICS CORPORATION
assignment · 215660967
Assignors
MORI, KENJI
On an employer assignment, the assignors are typically the inventors.