SYSTEM AND METHOD FOR OPTIMIZING PARAMETERS OF MULTIPLE RAIL VEHICLES OPERATING OVER MULTIPLE INTERSECTING RAILROAD NETWORKS
Patent №
US 8,630,757
Granted
2014-01-14
Filed 2007
Owner
GENERAL ELECTRIC COMPANY
Lab
—
AI components
3
kr · planning · hardware
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
11831492
In a railway network a method for linking at least one of train parameters, fuel efficiency emission efficiency, and load with network knowledge so that adjustments for network efficiency may be made as time progresses while a train is performing a mission. The method includes dividing the train mission into multiple sections with common intersection points, and calculating train operating parameters based on other trains in a railway network to determine optimized parameters over a certain section. The method further includes comparing optimized parameters to current operating parameters, and altering current operating parameters of the train to coincide with optimized parameters for at least one of the current track section and a pending track section.
AI classification
Ownership
GENERAL ELECTRIC COMPANY
assignment · 196260001
Assignors
DAUM, WOLFGANG, ERYUREK, EVREN, SHAFFER, GLENN ROBERT
On an employer assignment, the assignors are typically the inventors.