Patent №
US 8,640,340
Granted
2014-02-04
Filed 2010
Owner
KEPPEL OFFSHORE & MARINE TECHNOLOGY CENTRE PTE LTD
+2 more
Lab
—
AI components
1
planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
12759037
Installation vessels and methods for offshore wind turbine installation are disclosed. In one embodiment, a cantilever mast is used to transfer of wind turbine components from an installation vessel to an offshore installation site and guide the transfer to prevent undesired swinging movements of the wind turbine components. In another embodiment, a main crane is used in cooperation with a guide arm to transfer and guide wind turbine components from an installation vessel to an offshore installation site.
AI classification
Ownership
KEPPEL OFFSHORE & MARINE TECHNOLOGY CENTRE PTE LTD
assignment · 243990237
OFFSHORE TECHNOLOGY DEVELOPMENT PTE LTD
assignment · 243990237
KEPPEL FELS LTD
assignment · 243990237
Assignors
FOO, KOK SENG, CHIA, HOCK CHYE MICHAEL, MORTENSEN, ASBJORN, CHAN, CHENG CHOONG, LIM, TENG KIAT, WONG, TOH TUNG, OSTVOLD, TOM AKSEL WAITZ, HENRIKSEN, RUNE
On an employer assignment, the assignors are typically the inventors.