SYSTEM AND METHOD FOR CREATING BUILDING INFORMATION MODELING GEOMETRY BREAKDOWN STRUCTURE

Patent №

US 9,141,925

Granted

2015-09-22

Filed 2013

Owner

MYONGJI UNIVERSITY INDUSTRY AND ACADEMIA COOPERATION FOUNDATION

Lab

AI components

3

kr · planning · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

13830705

Disclosed herein is a system and method for generating a BIM geometry breakdown structure. The system includes a geometry breakdown system (GBS) range setting module, a GBS geometric object coding module, and a GBS geometric object coding module. The GBS range setting module sets the range of a GBS based on BIM framework variables. The GBS element definition module generates “standard information breakdown property information” that is used to manage work-type breakdown and location breakdown, “project numbering system (PNS) property information” that is used to manage a work breakdown system (WBS), a cost breakdown structure (CBS), and a standard-method-of-measurement (SMM) breakdown structure (MBS), and “GBS property information” that is used to define geometric information. The GBS geometric object coding module matches geometric objects to the “standard information breakdown property information” and the “PNS property information”, and assigns numbers corresponding to the “GBS property information” to the matched geometric objects.

AI classification

Planning1.00
AI hardware1.00
Knowledge representation0.85
Natural language0.01
Evolutionary computation0.01
Machine learning0.01
Vision0.00
Speech0.00

Ownership

MYONGJI UNIVERSITY INDUSTRY AND ACADEMIA COOPERATION FOUNDATION

assignment · 300060963

Assignors

JUNG, YOUNGSOO, LEE, YUNSUB, KIM, YESOL, KIM, MIN

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC