Patent №
US 9,201,410
Granted
2015-12-01
Filed 2011
Owner
GENERAL ELECTRIC COMPANY
Lab
—
AI components
2
planning · hardware
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
13335993
A method for optimizing one or more farm-level metrics in a wind farm is presented. The method includes identifying an optimization objective and one or more decision variables for optimization. Furthermore, the method includes optimizing the optimization objective based on wake-affected wind conditions, power capture values, or damage equivalent load values, to calculate optimum decision variable values for each wind turbine. The method also includes transmitting the optimum decision variable values to the respective wind turbines. In addition, the method includes applying the optimum decision variable values to the respective wind turbines to achieve the optimization objective. Systems and non-transitory computer readable medium configured to perform the method for optimizing one or more farm-level metrics in a wind farm are also presented.
AI classification
Ownership
GENERAL ELECTRIC COMPANY
assignment · 274390145
Assignors
AMBEKAR, AKSHAY, RYALI, VENKATARAO, TIWARI, AWADESH KUMAR
On an employer assignment, the assignors are typically the inventors.