Grid Optimization Resource Dispatch Scheduling

Patent №

US 9,523,967

Granted

2016-12-20

Filed 2014

Owner

Lab

AI components

3

kr · planning · hardware

Assignment

None on record

Dataset

AIPD

2023_r1 edition

Application

14211045

Data comprising a request specifying a desired change in electrical load for a defined period of time is received. The electrical load is associated with a plurality of resources under control of resource agents and on a utility grid. Available capacity of resources within the control of each resource agent over the defined period of time is determined. Each available capacity is determined at least using a resource load model. Using the determined available capacity of resources over the defined period of time, resource scheduling instructions are calculated for a subset of resources. The resource scheduling instructions satisfy the desired change in electrical load of the request. Data characterizing the resource scheduling instructions is provided. Related systems, apparatus, methods, and articles are also described.

Knowledge representationPlanningAI hardwareG05B 13/02G06Q 10/04G06Q 10/0631G06Q 50/06H02J 3/04H02J 3/003Y04S 10/50

AI classification

AI hardware1.00
Planning1.00
Knowledge representation0.94
Evolutionary computation0.36
Machine learning0.16
Vision0.01
Natural language0.00
Speech0.00
© 2026 NYSGPT2525 LLC