HIGH THROUGHPUT SYNCHRONOUS RESOURCE-CONSTRAINED SCHEDULING FOR MODEL-BASED DESIGN

Patent №

US 9,740,529

Granted

2017-08-22

Filed 2014

Owner

THE MATHWORKS, INC.

Lab

AI components

1

hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

14560509

A system and method for optimizing a system design that includes two or more components, where at least one component is to be implemented using a constrained resource. From an initial schedule, the resource having a longest span time between a start busy time slot and an end busy time slot is identified. The schedule for the other resources is then also extended to the span time. The resulting design can be made synchronous by inserting up-sampler and down-sampler function blocks before and after any strongly connected components.

AI hardwareG06F 9/5027G06F 8/4441G06F 30/30H03K 19/17758

AI classification

AI hardware0.95
Planning0.35
Machine learning0.00
Vision0.00
Speech0.00
Evolutionary computation0.00
Knowledge representation0.00
Natural language0.00

Ownership

THE MATHWORKS, INC.

assignment · 394030519

Assignors

SHEI, CHUN-YU, VENKATARAMANI, GIRISH

On an employer assignment, the assignors are typically the inventors.

From the same owner

© 2026 NYSGPT2525 LLC