Patent №
US 9,746,502
Granted
2017-08-29
Filed 2015
Owner
GENERAL ELECTRIC COMPANY
+3 more
Lab
—
AI components
1
planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
14615069
Systems and methods of monitoring a power system power converter are provided herein. The system includes a plurality of parallel-coupled power converters comprising a power converter input and a power converter output, the power converter output configured to be coupled to a load, each power converter of the plurality of parallel-coupled power converters comprising a power converter controller. The power converter controller is configured to compare an output current of a corresponding power converter to a predetermined output current threshold, monitor the output current for a predetermined time duration when the output current is below the predetermined output current threshold, and shut down the corresponding power converter when the output current is below the predetermined output current threshold for the predetermined time duration.
AI classification
Ownership
GENERAL ELECTRIC COMPANY
assignment · 348990617
ABB SCHWEIZ AG
assignment · 502070405
ABB POWER ELECTRONICS INC.
assignment · 524300136
ACLEAP POWER INC.
assignment · 648190383
Assignors
GAUTAM, RAVI, SUBRAMANIAM, PALANIVEL, REDDY, RAGHOTHAMA
On an employer assignment, the assignors are typically the inventors.