DATA MIGRATION PLANNING AND SCHEDULING BASED ON DATA CHANGE RATE ANALYSIS

Patent №

US 11,630,846

Granted

2023-04-18

Filed 2021

Owner

INTERNATIONAL BUSINESS MACHINES CORPORATION

AI components

2

evo · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

17158215

Data migration based on data change rate analysis is provided. A minimum data replication duration is calculated for each respective data migration event of a set of data migration events in an existing data migration wave plan by adjusting a planned data replication duration until a data change rate per day of servers is equal to an estimated server data replication rate per day when the existing data migration wave plan is not feasible. A new data replication start date, a new data replication end date, and a new data migration cutover date is determined for each respective data migration event based on the minimum data replication duration for each respective data migration event. A new data migration wave plan is generated based on the new data replication start date, the new data replication end date, and the new data migration cutover date for each respective data migration event.

Evolutionary computationAI hardwareG06F 16/275G06F 9/505G06F 11/3034G06F 11/3442G06F 16/214G06F 16/2308G06F 11/3409

AI classification

Evolutionary computation0.99
AI hardware0.62
Knowledge representation0.23
Planning0.15
Natural language0.01
Vision0.00
Machine learning0.00
Speech0.00

Ownership

INTERNATIONAL BUSINESS MACHINES CORPORATION

assignment · 550290778

Assignors

ANDOOR VEETTIL, HAREESH, SAURABH, KUMAR

On an employer assignment, the assignors are typically the inventors.

From the same owner

© 2026 NYSGPT2525 LLC