Patent №
US 12,411,486
Granted
2025-09-09
Filed 2022
Owner
International Business Machines Corporation
Lab
AI components
0
Assignment
None on record
Dataset
AIPD
Application
17670017
A first set of data associated with assets can be received. An ontology graph can be constructed based on the first set of data. A second set of data associated with the assets can be received, the second set of data having a first frequency of sampling. Based on the second set of data, nodes of the ontology graph representing the assets can be characterized. A third set of data associated with the assets can be received, the third set of data having a second frequency of sampling. The third set of data can include real time data associated with the assets. Based on the third set of data and information associated with the assets represented by the ontology graph, a deep learning neural network can be trained to predict a future state of at least one asset of the assets and discover dynamic mutual impact of the assets.
Ownership
International Business Machines Corporation