Patent №
US 6,876,894
Granted
2005-04-05
Filed 2003
Owner
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY
Lab
—
AI components
1
planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
10701960
A method and apparatus for simulating the functioning of various configurations of fabrication and test equipment within a manufacturing line creates a schedule for dispatching of the production lots to the manufacturing line. Based on the product mix forecast, the product volume forecast, the predicted sales schedule, the sales confidence, the actual sales order descriptions, and the product delivery schedule, a potential product dispatch schedule is established that enables a product to be fabricated within the manufacturing line. An equipment dispatch schedule for equipment employed in fabrication and testing of the product to be fabricated is defined according to the product dispatch schedule. The potential product dispatch schedule is then simulated based on the process and test equipment model. Upon completion of the simulation, the potential product dispatch schedule is assessed for optimization.
AI classification
Ownership
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY
assignment · 146790338
Assignors
CHEN, NAI-CHIANG, LIN, TA-CHIN, CHANG, JOSEPH, CHEN, CHUNG-SHEN, CHIU, VINCENT
On an employer assignment, the assignors are typically the inventors.