METHOD FOR TARGET QUEUE TIME CALCULATION IN SEMICONDUCTOR MANUFACTURING PLANNING

Patent №

US 6,963,785

Granted

2005-11-08

Filed 2003

Owner

TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

Lab

AI components

1

planning

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

10733057

A method is provided for product culmination estimation in a microelectronics manufacturing environment. The method includes providing a manufacturing executing system including a plurality of processing entities. The manufacturing executing system provides interconnectivity and management of the processing entities. The method also assigns a standard queue time factor to product advancing through the manufacturing executing system, and determines an actual and theoretical cycle time and associated with the product through each process entity of the manufacturing executing system. The method further includes anticipating a target queue time for the product through the manufacturing executing system, and forecasting product cycle time of the product through the manufacturing executing system.

PlanningG05B 19/41865G05B 2219/31378G05B 2219/45031Y02P 90/02Y02P 90/80

AI classification

Planning0.99
Machine learning0.41
Vision0.17
Evolutionary computation0.14
Knowledge representation0.13
Natural language0.01
AI hardware0.00
Speech0.00

Ownership

TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD.

assignment · 152180914

Assignors

CHEN, JU-KAU, CHANG, CHAO-FAN, WU, WEN-PIN, FANG, GWO-CHIANG, OU, MING-FENG

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC