SYSTEM AND METHOD OF CONTROL FACTOR MANAGEMENT

Patent №

US 7,103,435

Granted

2006-09-05

Filed 2003

Owner

TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD.

Lab

AI components

3

planning · evo · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

10677569

A system and method for control factor management for a work-in-process (WIP) in a production system. A plan engine is programmed to receive an order for a product, reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors, and generate a plan for the WIP of the order according to a control factor. A control factor management module adjusts the control factor of the plan engine according to a current value of the control factor in the production system, a target value of the control factor, and a priority of the WIP. Preferably, a control factor matrix of the product is provided in the control factor management module as a function of the current value of the control factor in the production system, the target value of the control factor, the priority of the WIP, and a target date of the order.

AI classification

Planning1.00
Evolutionary computation0.98
AI hardware0.73
Knowledge representation0.34
Machine learning0.09
Natural language0.00
Vision0.00
Speech0.00

Ownership

TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD.

assignment · 145860855

Assignors

CHAO, JEN-LIN, CHANG, CHIN-YUNG, YEN, WEI-KUO

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC