METHOD AND SYSTEM OF MANAGING PRODUCTION QUANTITY

Patent №

US 7,805,328

Granted

2010-09-28

Filed 2004

Owner

PENTAX CORPORATION

+1 more

Lab

AI components

4

kr · planning · evo · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

10773239

There is provided a method of managing production quantity that includes determining a standard inventory quantity of products to be stocked in the single delivery center for a time of at least one predetermined cycle ahead based on a shipment record of the single delivery center, and determining a total assembly quantity of products to be assembled by the at least one factory for a time of at least one predetermined cycle ahead based on the determined standard inventory quantity of the single delivery center and an actual inventory quantity of the at least one factory.

AI classification

AI hardware0.99
Evolutionary computation0.99
Knowledge representation0.90
Planning0.76
Vision0.01
Machine learning0.00
Natural language0.00
Speech0.00

Ownership

PENTAX CORPORATION

assignment · 149730650

HOYA CORPORATION

merger · 248760150

Assignors

SUZUKI, YUYA, WATANUKI, TAKASHI, KAWAKAMI, MASAYUKI, SAITO, HIROSHI, OHTANI, TAKUMI

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC