DEVELOPMENT OF ACTUAL RISK COSTS BASED ON ESTIMATED RISK COSTS AS WELL AS PROBABILISTIC RESTRICTION OF THE ACTUAL RISK COSTS
Patent №
US 7,805,329
Granted
2010-09-28
Filed 2007
Owner
SIEMENS AKTIENGESELLSCHAFT
Lab
—
AI components
2
ml · planning
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
11681540
An evaluation is performed for a device, an application and/or a method, in particular a method for establishing a technical system such as a power plant for instance, the assessment being carried out on the basis of costs for risks. In accordance with the method, the costs for specific risks are to be assessed. A risk costs interval is to be determined, which contains the actual risk costs with high probability. This is achieved by a regression of intuitive assignments to a straight line by an indirect linear regression by a non-linear regression in an intermediate diagram.
AI classification
Ownership
SIEMENS AKTIENGESELLSCHAFT
assignment · 190020197
Assignors
MAECKEL, OLIVER, SUTOR, ARIANE
On an employer assignment, the assignors are typically the inventors.