FINITE CAPACITY SCHEDULING USING JOB PRIORITIZATION AND MACHINE SELECTION

Patent №

US 7,904,192

Granted

2011-03-08

Filed 2004

Owner

AGENCY FOR SCIENCE, TECHNOLOGY AND RESEARCH

Lab

AI components

2

planning · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

10758468

In a method, device, and computer-readable medium for finite capacity scheduling, heuristic rules are applied in two integrated stages: Job Prioritization and Machine Selection. During Job Prioritization (“JP”), jobs are prioritized based on a set of JP rules which are machine independent. During Machine Selection (“MS”), jobs are scheduled for execution at machines that are deemed to be best suited based on a set of MS rules. The two-stage approach allows scheduling goals to be achieved for performance measures relating to both jobs and machines. For example, machine utilization may be improved while product cycle time objectives are still met. Two user-configurable options, namely scheduling model (job shop or flow shop) and scheduling methodology (forward, backward, or bottleneck), govern the scheduling process. A memory may store a three-dimensional linked list data structure for use in scheduling work orders for execution at machines assigned to work centers.

AI classification

Planning1.00
AI hardware0.99
Machine learning0.34
Knowledge representation0.03
Evolutionary computation0.00
Speech0.00
Vision0.00
Natural language0.00

Ownership

AGENCY FOR SCIENCE, TECHNOLOGY AND RESEARCH

assignment · 149090188

Assignors

CHUA, TAY JIN, YIN, XIAOFENG, ZHU, JUPING, CAI, TIANXIANG

On an employer assignment, the assignors are typically the inventors.

© 2026 NYSGPT2525 LLC