JOB PREEMPT SET GENERATION FOR RESOURCE MANAGEMENT

Patent №

US 7,920,282

Granted

2011-04-05

Filed 2006

Owner

INTERNATIONAL BUSINESS MACHINES CORPORATION

AI components

4

kr · planning · evo · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

11360127

A method is provided for prioritizing jobs in a computing environment having a plurality of nodes sharing one or more resources. Such method includes, given a job A to be scheduled having certain resource requirements, generating a list P of already scheduled jobs which utilize resources required by job A and which can be preempted by job A. For each resource requirement of job A, an ordered list of jobs which can be preempted by job A is created which is ranked by the applicability of each job in the list relative to resource requirements of job A, so as to provide a plurality of ordered lists, one for each resource requirement. An ordered list L is generated by selecting one of the ordered lists, adding the top-ranked job from that ordered list to list L, then adding the top-ranked job from another one of the ordered lists to list L and so on, by repetitively selecting the top-ranked job from individual ones of all the ordered lists. Finally, a set of jobs to be preempted by job A is selected based on the list L of jobs.

AI classification

Planning1.00
AI hardware1.00
Knowledge representation0.96
Evolutionary computation0.56
Machine learning0.44
Natural language0.01
Vision0.00
Speech0.00

Ownership

INTERNATIONAL BUSINESS MACHINES CORPORATION

assignment · 174120814

Assignors

COPPINGER, RICHARD J., DRUYAN, ALEXANDER

On an employer assignment, the assignors are typically the inventors.

From the same owner

© 2026 NYSGPT2525 LLC