Computing system predictive build

Patent №

US 9,218,583

Granted

2015-12-22

Filed 2013

Owner

INTERNATIONAL BUSINESS MACHINES CORPORATION

AI components

2

planning · hardware

Assignment

Recorded

Dataset

AIPD

2023_r1 edition

Application

13853916

Features to include within a predictive build of a computing system are selected. The predictive build is an anticipated final build of the computing system prior to receiving a firm customer order for the computing system in accordance with which an actual final build of the computing system is then built. A marginal cost of first building the predictive build and then modifying the predictive build to realize the actual final build, as compared to building the actual final build without first building the predictive build and then modifying predictive build to realize the actual final build, is estimated based on the features selected. Responsive to determining that the marginal cost is less than a predetermined acceptable marginal cost limit, the predictive build is built prior to receiving the firm customer order, and then is modified to realize the actual final build upon receiving the firm customer order.

PlanningAI hardwareG06Q 30/0621G05B 19/41865G06N 5/04G06Q 10/06313G06Q 30/0283G06Q 30/0635

AI classification

Planning1.00
AI hardware0.57
Machine learning0.13
Vision0.09
Evolutionary computation0.06
Knowledge representation0.03
Natural language0.01
Speech0.00

Ownership

INTERNATIONAL BUSINESS MACHINES CORPORATION

assignment · 301180632

Assignors

SAHAWNEH, RAMI J., STANQUIST, GERALD G., WALDRON, JOHN M.

On an employer assignment, the assignors are typically the inventors.

From the same owner

© 2026 NYSGPT2525 LLC