Patent №
US 9,501,115
Granted
2016-11-22
Filed 2013
Owner
INTERNATIONAL BUSINESS MACHINES CORPORATION
Lab
AI components
3
kr · evo · hardware
Assignment
Recorded
Dataset
AIPD
2023_r1 edition
Application
13905432
A method and system for optimizing power consumption of a data center by dynamic workload adjustment. At least one candidate workload solution for the data center is generated. Each candidate workload solution represents a respective application map that specifies a respective workload distribution among application programs of the data center. Workload of the data center is dynamically adjusted from a current workload distribution to an optimal workload solution. The optimal workload solution is a candidate workload solution of the at least one candidate workload solution having a lowest sum of a respective power cost and a respective migration cost. Dynamically adjusting the workload of the data center includes: estimating a respective overall cost of each candidate workload solution, selecting the optimal workload solution that has a lowest overall cost as determined from the estimating, and transferring the optimal workload solution to devices of a computer system for deployment.
AI classification
Ownership
INTERNATIONAL BUSINESS MACHINES CORPORATION
assignment · 305120850
Assignors
MANDAGERE, NAGAPRAMOD, MURTHY, SESHASHAYEE S., UTTAMCHANDANI, SANDEEP M., ZHOU, PIN
On an employer assignment, the assignors are typically the inventors.